Twenty-Three Years of Gas Injection into A Highly Undersaturated Crude Reservoir

Author:

Cotter W.H.1

Affiliation:

1. Bahrain Petroleum Co., Ltd.

Abstract

Abstract Gas injection, as a means of pressure maintenance, has been employed in the Bahrain field Second Pay Limestone reservoir for the last 23 years. The crude contained in this reservoir is highly undersaturated. This paper describes the methods used to calculate the quantity of gas entering into solution in the reservoir crude and the indicated recovery of oil by gas, which has been found to be much greater than that by water drive. The paper also relates the history of the gas-cap expansion and its final shape as defined by neutron logging. Introduction and History The Bahrain field is situated in an anticlinal feature of middle Cretaceous period, containing a number of separated conformable pay zones. The most important of these, both from the standpoint of size and commercial reserves, is the one which has been named the "Second Pay Limestone". This paper deals with the performance of this reservoir, first when it was solely under natural water drive and later when pressure maintenance by gas injection was utilized. The Second Pay Limestone reservoir is about 6 1/2-miles long X 2 1/2-miles wide. It is a continuous zone with numerous small faults, none of which appears to affect the pressure-production performance. The contained rock is a soft, porous, sugary limestone with limited fractures and vugs, and its average thickness is 110 ft. The original water-oil contact was placed at a depth of –2,175-ft subsea. Core analyses indicate the porosity of the rock to be between 20 to 30 per cent and the average permeability as 40 md. However, the permeability of the reservoir determined by pressure build-up curve analyses or from steady-state radial- flow formula is much higher, being of the order of 1 darcy. The original reservoir pressure was 1,236 psig at the chosen datum of –1,900-ft subsea. There was no original gas cap in the reservoir because the crude oil in place is highly undersaturated, having a bubble point of 278 psig at a reservoir temperature of 140F and a solution gas-oil ratio of 142 cu ft/bbl. The viscosity of the crude under reservoir conditions is between 2.2 and 2.3 cp. Early production from the reservoir was taken from wells situated on the crest of the structure, since the mechanism of production was thought to be water drive. From the pressure-production history, however, it was soon evident that water influx was not keeping pace with the rate of oil withdrawal and that a considerable proportion of the oil was being produced by expansion of the reservoir crude, as shown by the pressure decline curve of Fig. 1. The utimate recovery from the natural depletion mechanism was calculated to be low and, after an engineering study had been made, it was decided that pressure maintenance by gas injection should be attempted to improve recovery. Accordingly, gas injection to the crest of the reservoir was commenced in April, 1938. The gas for injection was obtained from a deeper and higher-pressured Arab zone gas reservoir, and the cost of expensive compressor plants thus was eliminated. After 23 years, gas for injection is still being acquired in this way. JPT P. 361^

Publisher

Society of Petroleum Engineers (SPE)

Subject

Strategy and Management,Energy Engineering and Power Technology,Industrial relations,Fuel Technology

Cited by 6 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Reservoir Performance Analysis of Eighty-Four Years of Immiscible Gas Injection in a Matured Carbonate Reservoir, Bahrain Field;Day 2 Tue, November 01, 2022;2022-10-31

2. Gas Injection for Pressure Maintenance in Fractured Reservoirs;Fundamentals and Practical Aspects of Gas Injection;2021-07-29

3. Introduction to Gas Injection;Fundamentals and Practical Aspects of Gas Injection;2021-07-29

4. A pore-scale study of foam-microemulsion interaction during low tension gas flooding using microfluidics- secondary recovery;Journal of Petroleum Science and Engineering;2021-06

5. Immiscible Gas Injection in Oil Reservoirs;Reservoir Engineering and Petrophysics;2007

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3