Transforming Challenges into Opportunities to Design Fit for Purpose Long Term Polymer Injectivity (LTPI) Pilots in Umm Gudair Minagish Oolite Reservoir, West Kuwait

Author:

Khan Mohammad Yunus1,Kamal Dawood1,Al-Mayyan Haya Ebrahim Ali1,Pradhan Akshaya Kumar1,Eadulapally Satish Kumar1,Al-Murayri Mohammed Taha1

Affiliation:

1. Kuwait Oil Company

Abstract

AbstractUmm Gudair Minagish Oolite is a highly heterogeneous reservoir with intermittent micritic units forming low permeability barriers to fluid flow. Based on screening/lab study, the polymer or surfactant-polymer flooding was proposed using normal 5 spot injection pattern. KOC decided to test only polymer flooding because of cost considerations. This study is to design fit for purpose long-term polymer injectivity (LTPI) pilot using produced water (salinity 230000ppm) with the objectives of testing injectivity, adsorption, breakthrough, resistance factor and response time within 6-12 months.Numerical simulation and economic modelling was used for this evaluation to explore various novel strategies. Various parameters were optimized to design Fit for Purpose LTPI pilot configurations using high salinity produced water. The laboratory experiments were conducted in conjunction with reservoir simulation to confirm the technical viability of polymer flooding using high-salinity water. In this study, we discuss existing challenges and how the same was transformed into opportunities by optimizing various parameters such as number of wells, well spacing, well location, perforation layer for injectors and producer and the economics to meet pilot objectives.The simulation results show that normal 2-spot injection pattern (2 injectors and 1 producer) with 80m well spacing and perforation in B-zone is a suitable solution for LTPI pilot within given time. Based on the above plan, one injector was drilled near the existing producer. The recent gyro survey demonstrated shifting of the sub-surface locations of both the producer and injector, thereby altering the well spacing. Further simulation incorporating the new locations indicated that the pilot would not meet the objectives within the piloting duration of 6 months because of shifting. Surface constrains hindered the shifting of drilling location for the second injection well to maintain 2-spot injection pattern. To overcome this challenge, additional simulation works performed to plan and drill the second injector well near another existing producer at 80m well spacing in a different area to test different rock types. Both LTPI pilot designs show higher incremental cumulative oil over water flood, faster polymer breakthrough (∼1 month), faster polymer response and oil peak within 6 months. In addition, using high salinity produced water for polymer flooding is expected to reduce piloting cost and increase operational efficiency by reducing operational problems associated with treatment and handling of less saline water.

Publisher

SPE

Reference19 articles.

1. Evaluation of the hydrocarbon source rock and the reservoir characterization of the Minagish Formation using wireline logs;Aladwani;Heliyon,2022

2. Improved Understanding of Vertical Barriers/Baffles by History Match Analysis;Al-Sayegh,2019

3. Water Shutoff and Zonal Isolation for High Permeability Depleted Reservoir Using Organically Crosslinked Polymer Sealant System;Al-Azmi,2020

4. From Static Model to Upscaling (Real Case Study in Umm Gudair Field, West Kuwait);Al-Fadli,2015

5. Application of Specially Designed Polymers in High Water Cut Wells-A Holistic Well-Intervention Technology Applied in Umm Gudair Field, Kuwait;Al-Azmi,2021

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3