Successful Application of Innovative Engineering Approach to Reenter Problematic Reservoirs Leads to Astonishing Results: A Case Study

Author:

Al-Refai I. M.1,Gratia P. I.1

Affiliation:

1. Saudi Aramco D&WO

Abstract

Abstract Objectives/Scope: Sidetrack drilling in depleted unconsolidated sandstone reservoirs with overlying reactive shale faces many engineering and operation challenges. Depleted reservoirs require a low mud weight to avoid stuck pipe due to differential sticking. Reactive unstable shale requires a higher mud weight to provide hole stability. Installing sand screens across the reservoir adds additional complication to drilling operations. Proper planning is key to overcoming drilling challenges. Planning includes selection of well design, directional trajectory planning and mud selection. The selection of casing design depends on reservoir pressure and logging requirements. The requirement for a dual lateral completion also affects the hole configuration. The optimum kickoff point, maximum dog leg severity, inclination across the shale zone, shale footage and trajectory azimuth play important roles in the success of sidetracking operations. Mud weight and mud rheology are thoroughly planned and closely monitored during the operations. Drilling with a rotary steerable Bottom Hole Assembly (BHA) and deploying sand screen completion, such that it reduces chances of differential sticking, are also critical parts of the planning. Many wells have been successfully sidetracked and completed to meet reservoir management objectives. The casing design of reentry wells has evolved from two (2) hole sections to one (1) hole section and has saved 32% of the drilling time and has reduced the well cost by 23%. Appropriate well direction (azimuth) and correct mud weight related to maximum or minimum stress direction have been identified utilizing special geomechanics software. The salinity of an oil-based mud (OBM) is critical while drilling through reactive shale. Water activity tests on shale samples is used to design the proper OBM and special monitoring protocols were established to ensure the rheology of the OBM. A modified sand screen completion has been proven to reduce the potential occurrence of stuck pipe. Most of key factors in planning can be applied in all wells to some extent. Each well is uniquely based on its subsurface targets and reservoir pressure.

Publisher

SPE

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3