Successful Primary Cementing Can Be a Reality

Author:

Smith R.C.1

Affiliation:

1. Amoco Production Co.

Abstract

Distinguished Author Series articles are general, descriptive representations that summarize the state of the art in an area of technology by describing recent developments for readers who are not specialists in the topics discussed. Written by individuals recognized as experts in the area, these articles provide key references to more definitive work and present specific details only to illustrate the technology. Purpose: to informthe general readership of recent advances in various areas of petroleum engineering. Introduction The most important operation performed on a well is the primary cementing job at the time of completion. It must primary cementing job at the time of completion. It must achieve complete zonal isolation in the wellbore; that is, obtain a hydraulic seal of cement to casing and cement to formation while atthe same time eliminating mud or gas channels within the cement sheath. Fig. Idepicts the objective. If the cementing operation is not performed correctlyand successfully, the well most likely will never be the total well it couldhave been. A successful primary cementing job requires a positive attitude. commitment, dedication, proper alignment of priorities, and application of proven technology. This paper presents an overview of primary cementing and the interaction of the various factors necessary to achieve a successful job. Several references are included that furnish detailed instruction. Discussion Consider the overall primary cementing operation as a chain with three links:cementing philosophy,knowledge, andquality control. Although these are separate and distinct links, they are interdependent. Eachis discussed in this paper. Cementing Philosophy Through many years of association with cementing operations, I have arrived at one major conclusion: Primary cementing field practices must go through a major revolution to achieve increased cementing success. This revolution mainly involves a rededication to application of technology and materials already available, and requires a change in attitude, commitment, dedication, and setting proper priorities. As summarized in Fig. 2, these factors form the foundation for successful cementing. The adage "mix it, pump it, and bump it" is archaic. The negative attitude ("It's impossible to get a good primary job, so why try?") is a self-fulfilling prophecy. The positive attitude must contain a real commitment to a successful job and will involve dedication of people, time, and money. The usual response to the foregoing statement is "time and people are not available for such acommitment." Yet time and people always are allocated to repair a poor primarycementing job that can cost from a few thousand primary cementing job that can cost from a few thousand to several hundred thousand dollars. So time, people, and money are available to do the job correctly the first time. What is lackingis the setting of proper priorities. What is the first priority? A successful cementing job the first time! Usually, the added cost to perform a successful primary job is much less than the cost of remedial work primary job is muchless than the cost of remedial work to repair a failure (not to mention the potential delay or loss of production). In fact. substantial savings arepossible with a successful primary job. possible with a successful primary job. If this cementing philosophy is to work, a team effort is essential. This will involve the service company, the operator, and the rig contractor communicating and cooperating together. From the operator's standpoint, the team effort required to handle the varied quality control measures will involve not onlythe drilling foreman, but also the dedication of one or two drilling orcompletion engineers. All personnel must apply the total engineered conceptwhich starts with planning, continues through design, blending, and mixing, andculminates in displacement. The drilling engineer usually is involved intenselyin drilling the well safely and as fast and economically as possible. His interest is directed toward minimizing the possible. His interest is directedtoward minimizing the number of days to reach the target depth. However, hisultimate objective still must be to provide a wellbore suitable forcementing. JPT p. 1851

Publisher

Society of Petroleum Engineers (SPE)

Subject

Strategy and Management,Energy Engineering and Power Technology,Industrial relations,Fuel Technology

Cited by 9 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3