Closed Loop Reservoir Management Using the Ensemble Kalman Filter and Sequential Quadratic Programming

Author:

Lorentzen Rolf Johan1,Shafieirad Ali1,Naevdal Geir1

Affiliation:

1. Intl Research Inst of Stavanger

Abstract

Abstract As part of the SPE-ATW "Closed-loop reservoir management" held in Bruges, June 2008, a synthetic data set was made available to the participants. This paper describes our workflow and results for closed-loop reservoir management using this synthetic model. The closed-loop exercise is divided into two cycles, each consisting of data assimilation and production optimization. The data assimilation is done using the ensemble Kalman filter, and the optimization is done using sequential quadratic programming after a reformulation of the problem to reduce the number of variables. The methodology performs well on the case considered here, and high NPV values are obtained. In particular we have proposed a new strategy for production optimization that makes a large scale optimization problem feasible through a proper reduction of control variables based on analysis of the properties of the field and application of a state of the art optimization method. Introduction Closed-loop reservoir management is typically performed in two steps, an identification and updating step, and an optimization step where an updated reservoir model is used for long term production optimization. Over the last years there have been published a number of studies demonstrating the benefits of closed-loop reservoir management see e.g., Jansen et al. (2005); Nævdal et a. (2006); Sarma et al. (2006); Wang et al. (2007); Chen et al. (2008). In these studies, closed-loop reservoir management has been applied on small synthetic reservoir models, and different combination of approaches has been used for the updating and the production optimization step. As part of the SPE-ATW "Closed-loop reservoir management" arranged in Bruges, June 2008, the participants were invited to perform a closed-loop study on a large-scale model which was more realistic than the models in the previous studies. Another level of complexity included in this study was the fact that the "true" model was hidden to the participants and only known as TNO. The idea was to mimic the workflow performed applied while applying closed-loop reservoir management for a real reservoir. In this cases the reservoir is a synthetic model which consists of 450,000 grid cells. This true model was first used by TNO to generate ten years of initial production history for the field, and then also applied when running the production strategies provided by the participants for the next 2×10 years. (Closed-loop reservoir management is expected to be performed at a shorter time interval than ten years, but this constraint was included to make the workload reasonable for TNO).

Publisher

SPE

Cited by 15 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Reducing the Geological Uncertainty by History Matching;Introduction to Geological Uncertainty Management in Reservoir Characterization and Optimization;2023

2. Adaptive Rank-Based Selection of Geological Realizations for Optimum Field Development Planning;SPE Journal;2022-03-07

3. Production optimization using a modified net present value;Computational Geosciences;2020-02-05

4. OLYMPUS optimization under geological uncertainty;Computational Geosciences;2019-09-09

5. Effect of systematic and random flow measurement errors on history matching: a case study on oil and wet gas reservoirs;Journal of Petroleum Exploration and Production Technology;2019-04-19

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3