Annular Pressure and Temperature Measurements Diagnose Cementing Operations

Author:

Cooke C.E.1,Kluck M.P.2,Medrano Ruben2

Affiliation:

1. Exxon Production Research Co.

2. Exxon Co. U.S.A.

Abstract

Summary Pressure and temperature measurements were made in the Pressure and temperature measurements were made in the annulus of wells with sensors placed on the casings as they were run into the wells. The primary purpose of these measurements was to study the phenomenon of pressure reduction in the cement as it cures. This aspect of the measurements was reported in Ref. 1. Other phenomena were observed during these measurements, however, which are important to the cementing of a well and to casing design. This paper discusses three such phenomena: temperature in the annulus during cementing, loss of returns during cementing, and long-term pressure decline in a mud column above cement. The industry has made several studies over the years to improve the prediction of temperature of cement during pumping. The predictions of bottomhole circulating temperature (BHCT) from an extensive API study agree well with measured data in three of the five wells discussed in this paper. However, better predictions of cementing temperature in all five wells were obtained with a numerical method. The phenomenon of loss of returns during cementing can be very complex. Pressures in the cement during pumping may be greater than expected because the pumping may be greater than expected because the cement is rising more than anticipated (because of bypassing of mud) or for other reasons. The resistance of the wellbore to hydraulic fracturing and consequent loss of returns is difficult to predict accurately. The behavior in two wells is described. Casing design requires assumptions about the pressure behind the casing to calculate internal burst pressure. The data available from two wells indicate that hydrostatic pressure exerted by mud left in the annulus above cement pressure exerted by mud left in the annulus above cement decreases with time, and original mud weights should not be used as the backup pressure in casing burst design. Introduction Results of pressure and temperature measurements made in the annulus of wells during and after cementing operations were reported in Ref. 1. That paper focused on the importance of pressure decline in the cement column in the time interval after the cement is pumped and before the cement has cured. Observations regarding remedial cementing and acidizing treatments were reported also. The procedures and equipment used in those measurements were described and are not repeated in detail in this paper. This paper provides comparisons of measured and predicted BHCT's during cementing. The predicted predicted BHCT's during cementing. The predicted temperatures were developed from two sources: an API publication and a numerical calculation. An API task publication and a numerical calculation. An API task group provided very valuable data for predicting BHCT. The API correlation is now a part of Ref. 3. (The same data were provided in the preceding API document, RP 10B, which was superseded.) These data were collected from 78 wells in 10 states, at depths of 4,000 to 23,000 ft [1219 to 7010 m]. Numerical procedures for predicting downhole temperature during cementing also have predicting downhole temperature during cementing also have been developed over the years, the most recent being that by Wooley. This paper provides references to many earlier papers. Here, we compare measured temperatures to those predicted by the numerical method described by Sump and Williams. This numerical model was developed by fitting 28 unsteady-state circulating temperature measurements made in nine wells to derive heat transfer coefficients and effective formation thermal conductivities. The second topic concerns cementing of lost return zones (or lost circulation zones), a long-standing problem. Loss of returns often will occur during problem. Loss of returns often will occur during cementing even though the problem did not occur during drilling. Usual steps to solve the problem include the use of granular or fibrous materials in the cement or preflushes of material designed to form a precipitate and plug the channels or the fracture where returns are lost. The mechanism by which loss of returns occurs in some formations is not well understood, but in the examples in this paper the mechanism is believed to be hydraulic fracturing. A fracture is initiated when fluid pressures at the wellbore surface are greater than the tensile strength of the rock plus the compressive earth stress at the wellbore at some depth. The fluid pressure required to initiate a fracture is usually higher than the pressure required to open a preexisting natural or induced fracture or to propagate a fracture after it is formed. propagate a fracture after it is formed. The third topic discussed in this paper is the long-term decrease in hydrostatic pressure exerted by the mud column above the cement. JPT P. 2181

Publisher

Society of Petroleum Engineers (SPE)

Subject

Strategy and Management,Energy Engineering and Power Technology,Industrial relations,Fuel Technology

Cited by 7 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3