A New Cost Effective and Reliable Water Shutoff System: Case Study in Kuwait

Author:

Al-Ebrahim Ahmed E.1,Al-Houti Naser1,Al-Othman Moahmmad1,Hamad Al-Mehanna1,Al-Mehanna Mohammad1,Mubarak Abdullah1,Al-Adwani Yousef1,Mahmoud Wael2,Hai Liu2,Panga Mohan2,Lafitte Valerie2,Lee Jesse2

Affiliation:

1. Kuwait Oil Company

2. Schlumberger

Abstract

Abstract Increased water cut represents one of the biggest challenges to the oil industry, with more than 75% of the produced fluid being water that brings an increased cost per barrel of oil through water handling, scale deposition, corrosion, and mainly the bypassed oil reserve. Water shut off solutions range from mechanical solutions like bridge plugs to chemical treatments that include cement, resins and polymer gels. Cement applied as a plug or a squeeze treatment is often the preferred option to the operating company for isolating unwanted production intervals near the wellbore, and crosslinked polymer systems are also commonly used when deeper penetration is required. However, the success of these treatments often suffers from mixed fluid quality, zonal isolation (cementing quality), proper placement, numerous downhole conditions and more importantly backflow of unset cement slurry or immature gels while cleaning up leftover slurries in the wellbore or pulling out the work string after the treatment. In this paper, a new system based on a single nano-additive is described to shut off a water zone in a South Kuwait regional oil producer. The new system, which does not require curing but acts rapidly in porous media, addresses the concern of backflow associated with unset cement or crosslinked polymer fluids. The objective of this treatment was to seal off the upper zone that produces mostly water, reduce overall water cut from 90% to less than 10%, and test the productivity of the lower zone. The well configuration does not allow zonal isolation without a rig, so cement and other known chemical treatments were unsuitable for this application. Eighteen barrels of the water shut-off treatment was pumped through coiled tubing (CT) and injected into a 34 ft zone resulting in nearly immediate response through increased wellhead pressure. The injection was resumed every three to four hours to ensure a complete sealing of the target interval. The fluid starts workingupon injection into porous media but always remains as liquid phase when kept in the wellbore or surface tanks, so there is no concern about sticking or plugging the coil. The operational time was reduced compared to normal water shut off jobs, and the single additive fluid is low viscosity making surface mixing simple. The novelty of this water shut-off system is efficient sealing of a high permeability formation with minimal fluid and achieving a drastic water cut from 90% to1%. This new system, unlike polymer-based systems, doesn't degrade with temperature, water hardness or salinity, and plugging of the porous media works by acompletely different mechanism leading to a more robust barrier against water production with reduced interventional risk.

Publisher

SPE

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3