Cement Placement with Tubing Left in Hole during Plug and Abandonment Operations

Author:

Aas Bjarne1,Sørbø Jostein1,Stokka Sigmund1,Saasen Arild2,Statoil Rune Godøy3,Lunde Øyvind3,Phillips Conoco3,Vrålstad Torbjørn3

Affiliation:

1. IRIS/DrillWell

2. Det Norske Oljeselskap

3. SINTEF Petroleum Research/DrillWell

Abstract

Abstract Well abandonment operations can be very time-consuming and costly, and thousands of wells need to be permanently plugged and abandoned offshore Norway during the upcoming years. One possible way to reduce costs during P&A operations is to leave most of the production tubing in the well, as this would save significant rig time. A major concern with such an approach is, however, whether the cement will properly displace the original fluid, due to lack of tubing centralization and possible unfavorable flow dynamics in the annulus. In this paper, we demonstrate by full-scale experimental tests that it is possible to obtain good cement placement when the tubing is left in the hole, with and without control lines. Full-scale tests have been performed with both conventional and expandable cement to determine the sealing ability of annulus cement when tubing is left in hole. The quality of the cement placement was evaluated by pressure tests with water; where leakage rates and pressure drops over the test sections were recorded, and by visual inspection after cutting the test assemblies at different places. It is seen from the experiments that cement is well placed in the annulus when tubing is left in hole, but some microannuli are detected.

Publisher

SPE

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3