Effective Approach to Wellbore Clean Out Operation: A Case Study from Zawtika Phase 1B

Author:

Choodesh Attawit1,Rutland Marvin Gary1,Graham Grant Colin William2

Affiliation:

1. PTTEPI

2. PTTEP

Abstract

Abstract Free sand movement and fines mobilization during production in Zawtika field is one of the main challenges and can result in failures of production systems leading to SSHE exposure, loss of production or even well suspended. The optimum completion design Cased Hole Gravel Pack (CHGP) allows the well to maintain solid-free gas production with (limiting skin) selectivity, longevity and integrity throughout the life cycle. The Sand Control completion deployment, effectiveness and well productivity is directly related to the cleanliness of cased well bore and completion brine. The Total Solid Suspension (TSS) and Nephelometric Turbidity Units (NTU) or clarity of the fluid is the key indicator of well cleanliness. Zawtika Phase 1A post job review highlighted that Wellbore Cleanout (WBCO) is one of the most time consuming operation. To overcome this challenge and create areas of opportunities for improvement based on efficiencies, several possible solutions identified below. Excessive pipe dope, metal debris and rust from casing can collect within the well bore, bridge in perforation tunnels and ultimately damage reservoir or seriously hinder running completion components. The correct combination of Pipe Dope applying procedure, Chemical Displacement, Mechanical Movement and Hydraulic Displacement are the main key contributing factors to improved operation safety, deployment operational efficiency. Lab scale test conducted to simulate test for pipe dope removal chemical, Mechanical Casing Scraper and casing brush simulate testing in order to remove casing vanishing coating, also applying wellbore cleaning concept from drilling - rotational, pump rate and trip speed Recovery of metal or other debris in a limited number of runs gives several advantages: - Minimize reservoir damage - Reduces risks of screen plugging - Saves rig time. This paper will describe planning process, pipe dope procedure, wellbore clean out chemical / mechanical tool selection based on laboratory testing, displacement techniques, and operation summary. The potential cost saving to project can be more than 5 Million USD. The combination of this improvement in WBCO operation is able to reduce the operation time and cost in Phase 1B more than 71% comparing to Phase 1A performances in 2014-2015

Publisher

SPE

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Modeling and Optimization of Mechanical Cutting of Downhole Tubing;SPE Journal;2023-10-01

2. Nanoemulsions in Petroleum Industry;Nano Emulsions in Enhanced Oil Recovery;2022

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3