Intelligent Completion in Laterals Becomes a Reality

Author:

Bouldin Brett1,Turner Robert1,Bellaci Isidore1,Abu Ahmad Yousif1,Dyer Steven2,Oliveira Thales2,Bin Al-Sheikh Ali2

Affiliation:

1. Saudi Aramco

2. Schlumberger

Abstract

Abstract For many years, Saudi Aramco and Schlumberger have collaborated to develop a downhole system to merge multilateral technology and intelligent completions to create the world's first "smart laterals." This was the vision of Saudi Aramco's push to drive ever higher recovery factors, an extreme reservoir contact (ERC) approach to reservoir management. These wells can contain upward of 20 km of reservoir contact and require appropriate compartmentalization to ensure uniform heel to toe production throughout the reservoir. Proactive reservoir control is crucial for the efficient sweep of heterogeneous formations. This paper describes a full-scale multi-lateral, multi-compartment intelligent completion where many new technologies were integrated and demonstrated: Well construction and deployment practices to allow electrical umbilicals to be branched into laterals using inductive couplers.Deployment of revolutionary low power infinite position electrical flow control valves.Validation of a fully integrated production monitoring system providing direct downhole measurements of pressures, temperatures, flow rates, and water cut for each compartment.Integration of the surface acquisition and monitoring system with production SCADA to provide real-time downhole production information and health status. The ability to finely control downhole flow, measured directly at the reservoir face, has changed the way the industry will approach reservoir management. The sensing system has been validated with continuous compartment Productivity Index (PI), and multirate testing without shutting in the well. The SCADA integration allows a real-time management function where a compartment can be controlled to a target flow rate or draw down directly without resorting to traditional well system models to estimate choke orifice settings. This paper highlights the development, installation, and validation of this new ERC well system and identifies some of the immediate production impacts emerging from this level of visibility and control at the formation face.

Publisher

SPE

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Road to Well Completions Electrification to Support Sustainable Field Development;Day 1 Mon, May 06, 2024;2024-04-29

2. Sidetrack Trajectory Success Indicator;Day 2 Mon, February 20, 2023;2023-03-07

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3