Technology Focus: Horizontal and Complex-Trajectory Wells (November 2009)

Author:

Conran Greg1

Affiliation:

1. Schlumberger

Abstract

Technology Focus The past year has experienced dramatic changes in industry activities. Despite the downturn, it has been encouraging to see that there has remained an active interest through various industry events and discussions in improvement in the delivery of complex wells. I had the opportunity to participate in several SPE Advanced Technology Workshops (ATWs) and Forums related to this topic, and it was great to see record attendances, which provided for a diverse, yet high-quality, discussion and interaction. Design factors, improving drilling execution, and complex-well design, along with maximizing reservoir contact for horizontal and complex wells, are still major industry drivers, even though the industry has already drilled and completed many thousands of these wells. Every year, new technology enters the market place providing potential for improvement of all aspects of horizontal-well operations, but on the basis of excellent and open discussions at SPE events, there still are further challenges to overcome. Conclusions from several meetings included positive reactions to the introduction of new technologies in helping drive performance to new levels, but it was highlighted that the repeatability depended upon good knowledge capture and transfer of learning. Development of the structured approach, focused on continuous improvement, is as relevant today as it was 20 years ago. This message was echoed at all ATWs and Forums. The reduction in nonproductive time and overcoming operational challenges through better planning, although well known, are still a required focus. As the industry adapts to a constantly evolving horizontal- and complex-well environment, positional accuracy and placement of the well trajectory are critical to better reservoir contact and production. One interesting conclusion was that the successful drilling of many highly challenging wells appears to have been taken for granted. However, delivering the completion phase on long-stepout wells and management of the reservoir remain challenges for the future. Horizontal and Complex-Trajectory Wells additional reading available at OnePetro: www.onepetro.org SPE 118809 • "Beyond the Technical Limit: Turbodrilling—A Paradigm Shift to World-Class Horizontal-Well Construction" by Todd Mushovic, BP plc, et al. SPE 119599 • "Inflow-Control Device: An Innovative Completion Solution From Extended Wellbore to Extended Well Life Cycle" by Saif Ali Al Arfi, ADCO, et al. SPE 120579 • "A Comparison Between Multifractured Horizontal and Fishbone Wells for Development of Low-Permeability Fields" by Xiance Yu, University of Louisiana at Lafayette, et al. SPE 123008 • "First Applications of Inflow-Control Devices (ICDs) in Openhole Horizontal Wells in Block 15, Ecuador" by P. Roman, Petroamazonas, et al. OTC 19910 • "The Longest Challenge: Overview of a Groundbreaking Horizontal Well in Gimboa Field, Angola" by K.D. Contreiras, Sonangol Pesquisa & Produção, et al.

Publisher

Society of Petroleum Engineers (SPE)

Subject

Strategy and Management,Energy Engineering and Power Technology,Industrial relations,Fuel Technology

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3