Abstract
Technology Focus
The past year has experienced dramatic changes in industry activities. Despite the downturn, it has been encouraging to see that there has remained an active interest through various industry events and discussions in improvement in the delivery of complex wells.
I had the opportunity to participate in several SPE Advanced Technology Workshops (ATWs) and Forums related to this topic, and it was great to see record attendances, which provided for a diverse, yet high-quality, discussion and interaction. Design factors, improving drilling execution, and complex-well design, along with maximizing reservoir contact for horizontal and complex wells, are still major industry drivers, even though the industry has already drilled and completed many thousands of these wells.
Every year, new technology enters the market place providing potential for improvement of all aspects of horizontal-well operations, but on the basis of excellent and open discussions at SPE events, there still are further challenges to overcome. Conclusions from several meetings included positive reactions to the introduction of new technologies in helping drive performance to new levels, but it was highlighted that the repeatability depended upon good knowledge capture and transfer of learning.
Development of the structured approach, focused on continuous improvement, is as relevant today as it was 20 years ago. This message was echoed at all ATWs and Forums. The reduction in nonproductive time and overcoming operational challenges through better planning, although well known, are still a required focus.
As the industry adapts to a constantly evolving horizontal- and complex-well environment, positional accuracy and placement of the well trajectory are critical to better reservoir contact and production.
One interesting conclusion was that the successful drilling of many highly challenging wells appears to have been taken for granted. However, delivering the completion phase on long-stepout wells and management of the reservoir remain challenges for the future.
Horizontal and Complex-Trajectory Wells additional reading available at OnePetro: www.onepetro.org
SPE 118809 • "Beyond the Technical Limit: Turbodrilling—A Paradigm Shift to World-Class Horizontal-Well Construction" by Todd Mushovic, BP plc, et al.
SPE 119599 • "Inflow-Control Device: An Innovative Completion Solution From Extended Wellbore to Extended Well Life Cycle" by Saif Ali Al Arfi, ADCO, et al.
SPE 120579 • "A Comparison Between Multifractured Horizontal and Fishbone Wells for Development of Low-Permeability Fields" by Xiance Yu, University of Louisiana at Lafayette, et al.
SPE 123008 • "First Applications of Inflow-Control Devices (ICDs) in Openhole Horizontal Wells in Block 15, Ecuador" by P. Roman, Petroamazonas, et al.
OTC 19910 • "The Longest Challenge: Overview of a Groundbreaking Horizontal Well in Gimboa Field, Angola" by K.D. Contreiras, Sonangol Pesquisa & Produção, et al.
Publisher
Society of Petroleum Engineers (SPE)
Subject
Strategy and Management,Energy Engineering and Power Technology,Industrial relations,Fuel Technology
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献