Abstract

Abstract Operationally, a commercial Steam Assisted Gravity Drainage (SAGD) project differs in a number of respects to other production technologies, such as primary or Cyclic Steam Stimulation (CSS). First, the SAGD technology is unique in that when a SAGD well is shut-in, the recovery process continues to operate. Heat continues to be transferred into the cold bitumen and bitumen continues to drain down into the pool of hot liquids at the base of the chamber. Secondly, the process involves the generation of a large steam chamber, which has considerable heat storage. Short-term variances in steam injection have little impact on chamber pressure and therefore temperature. These unique characteristics present a number of opportunities to exploit seasonal and short-term variations in bitumen and gas prices to the advantage of the SAGD operator. Introduction As of December 2003, the announced or approved SAGD projects in Alberta have a cumulative predicted bitumen production of over eight hundred thousand barrels per day(1). The SAGD process is now clearly moving from an emerging technology to a commercial one. In light of its anticipated widespread application, an important area of study is the economic optimization of the SAGD operating practices. So far, it has been the practice to operate SAGD wells under steady operating conditions. Saturated steam is injected into a horizontal well at high temperatures, typically 200 – 225 ° C, and at pressures between 1.5 – 2.5 MPa. Early attempts were made, in the Dover Pilot Phase A, to determine whether cycles of pressure would lead to additional production rates from the process. It has generally been concluded that, given that cold bitumen (in Athabasca) is essentially a solid, very little effect on SAGD production or recovery is obtained by pressure cycling. For this reason, operators typically maintain a fairly constant chamber pressure over time. This paper contemplates the economic implications of manipulating the steam injection and bitumen production rates to coincide with seasonal variations or temporary extremes in commodity prices. The two commodity prices studied are the price of natural gas, which is used as fuel, and the price of bitumen. Upgraded bitumen is not contemplated in these evaluations. Analytical models are suggested for the determination of the value added, by timing of steam injection and bitumen production. A simulation model of Phase B at the Dover Project was used to estimate how Phase B would have reacted to variable injection and production. The Dover Project is the home of the first test of classical SAGD. The first commercial pilot, Phase B of the Dover Project, drilled in 1993, consists of three 500 m long horizontal well pairs and is still on production. Yee and Stroich provide a complete discussion of the historical Phase B operations(2). Markets and Price Variation Natural Gas The price of natural gas varies by season. The demand for gas in the North American market is much higher in the winter months because gas is used for heating.

Publisher

Society of Petroleum Engineers (SPE)

Subject

Energy Engineering and Power Technology,Fuel Technology,General Chemical Engineering

Cited by 4 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3