Theory and Practice of the Closed-Chamber Drillstem Test Method

Author:

Alexander L.G.1

Affiliation:

1. L.G. Alexander and Associates, Ltd.

Abstract

This paper describes a new method of drillstem testing to provide greater safety, precision, flexibility and secrecy than conventional methods. As testing progresses, the surface valve is closed during flow periods, an surface pressures are monitored to compute gas and/or liquid rate. Theoretical development of pertinent equations is discussed, and a field example is given to illustrate their use. Recommended procedures before and during the test are provided. Introduction The objective of drillstem testing (DST) is to obtain information on pressure, well potential, and fluid content of a reservoir. Accurate pressure data is required for hydrodynamic studies and as a starting point for reservoir studies. Well potential is determined from information on pressures and flow rates as a function of time. Fluid pressures and flow rates as a function of time. Fluid content of a reservoir can be established only if sufficient fluid has been produced to be identified in the drillpipe or caught in the sample chambers. This paper describes the closed-chamber technique with which it is possible to monitor the initial flow period of the drillstem test. It provides good field estimates of gas and liquid flow rates during preflow periods. These rates then can be used to determine minimum flow times necessary for fluid recovery and for presetting surface equipment, should the remainder of the test be conventional. Knowledge of the flow rate is useful for estimating the duration of shut-in time necessary to obtain a satisfactory pressure buildup. In addition, it is possible to calculate pressure buildup. In addition, it is possible to calculate permeability from the initial buildup. permeability from the initial buildup. Description of a Closed-Chamber Test A closed-chamber test is similar to a conventional DST in many ways. The major difference is that in the closed-chamber test, the well is closed in at the surface when producing and open at the surface only when shut in at the producing and open at the surface only when shut in at the formation. Instrumentation for the closed-chamber test is such that fluid influx is monitored throughout the test. Flow rates can be estimated as the test progresses. Flow rates and recoveries can be confirmed upon test completion. Fig. 1 shows the surface equipment used in conventional DST'S. Fig. 2 describes the additional gauge manifold needed at the surface for closed-chamber testing. This gauge manifold is used to observe and to record surface pressures during the test. Fig, 3 depicts subsurface equipment for closed-chamber testing. It is the same as that used for conventional testing, except for a pressure recorder located above the test valve. The pressure record is used to calculate fluid influx during the test and to confirm flow rates upon test completion. Theory Most DST's are run with empty drillpipe. When the test valve is open, gas and liquids enter the drillpipe and flow to the surface. Fig. 4 is a schematic representation of a typical test, where liquids are allowed in, but do not flow to surface. Gas is free to flow in and out of the drillpipe. Under normal operating conditions, gas is vented at the same rate as it enters, and no change of mass occurs in the system. However, if the flow rate of gas being vented differs from the entering flow rate, then the system mass will change according to the following mass balance for single-phase gas flow:(1) where mass in system = pMV/RTz mass rate in = pscMqin/RTsc mass rate out = pscMqout/RTsc JPT P. 1539

Publisher

Society of Petroleum Engineers (SPE)

Subject

Strategy and Management,Energy Engineering and Power Technology,Industrial relations,Fuel Technology

Cited by 5 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Fracture Driven Interaction (FDI) Diagnostics and Modeling at a Shut-In Open-Hole-Multi-Lateral Producing Well;Day 1 Tue, January 31, 2023;2023-01-24

2. Drill Stem Tests;Solved Problems in Well Testing;2023

3. Design and interpretation of transient tests at well's inception;Journal of Petroleum Science and Engineering;2016-09

4. BACK MATTER;Fundamental and Applied Pressure Analysis;1998-08

5. Application of mass balance of kick fluid in well control;Journal of Petroleum Science and Engineering;1991-09

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3