From Zero to Hero: A New Breakthrough of Stimulation Method by Combining Acidizing and Cyclic Extended Breakdown in Sawah Field

Author:

Ilfi _1,Setiyawan Hanif1,Masyhuri Ali1,Rusli _1,Mileota Christian Eliezer1,Ramadhan Iftikar Luthfi1,Nugroho Rinenggo1,Afton M1

Affiliation:

1. PT Pertamina Hulu Rokan, Rokan Block, Riau, Indonesia

Abstract

Abstract The Sawah field, a waterflood field, currently produces approximately 130,000 BFPD with an average 96% water-cut. The Fluid In Fluid Out (FIFO) stands at only 0.6, resulting in suboptimal waterflood performance. One cause of the low injection rate in Sawah field is injector plugging due to solid content and/or scale, and characteristics of the reservoir itself. Pressure Transient Analysis (PTA) further validates significant skin and permeability reduction. To improve the injection rate, workover activities are conducted on the targeted well using a combination of the Acidizing and C-EBD (Cyclic Extended Breakdown) methods. This involves a chemical and mechanical effort, where the acid dissolves scale, and the C-EBD creates fractures. Compatibility tests are conducted between acid and water production, as well as acid and water injection. A 15% HCl simple acid is injected with a 3-feet penetration near the wellbore using coiled tubing. Following soaking, the treatment continues by injecting water into the reservoir in 6 cycles, with 350-700 bbls of water for each cycle. During workover activities, improved injectivity was observed through Step Rate Tests (SRT). After acidizing, a rate of 2.5 bpm at 1,600 psi was achieved, followed by 3 bpm at 1,350 psi after the first 3 cycles of C-EBD. Further injectivity improvements occurred during subsequent C-EBD cycles, with the first 3 cycles reaching 2.4 bpm at 1,300 psi, and the next 3 cycles achieving 3.5 bpm at a similar pressure. Post Put on Injection (POI), the injection rate increased from 0-30 to 5,100-8,500 BWIPD, marking the well's highest injection rate in history. This notable success opens opportunity for Sawah Field, facilitating the reactivation of trade-off wells and increased capacity to handle additional fluids from size-up jobs or new wells. The collaborative efforts of the Subsurface, Research, and Workover Teams in the Sawah field were vital in achieving this remarkable result, contributing to longer injection well lifetimes, preventing overflow at surface facilities, and enhancing employee satisfaction. A lesson learned emphasizes the need to verify flow meter readings before and during execution, facilitating the prompt identification of problems or areas for improvement. Additionally, conducting an extra Step Rate Test (SRT) before acidizing serves as an added baseline. This successful approach is currently being implemented in other injectors within the Sawah field facing similar plugging issues, showcasing its ongoing effectiveness in enhancing operational practices.

Publisher

SPE

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3