_ This article, written by JPT Technology Editor Chris Carpenter, contains highlights of paper SPE 202172, “Drilling System Optimization Leads to Expedited Wells Delivery,” by Efe M. Ovwigho, SPE, Saleh Al Marri, and Abdulaziz Al Hajri, Schlumberger. The paper has not been peer reviewed. _ The authors write in the complete paper that simple changes in drillstring design can lead to huge savings in a climate requiring a constant push for reduction in well times and well costs and in improved well delivery. The complete paper explains the process that was followed before implementation of this solution. Introduction To access hydrocarbon reserves in a deep gas field, directional drilling through highly interbedded and abrasive formations was necessary. Designing a fit-for-purpose drilling system for optimal performance was critical. The reservoir drainage strategy required that the development wells be drilled directionally to attain a horizontal displacement of 1,500–2,500 ft at the 7-in. liner point above the gas reservoir formation. The well architecture was designed such that the well would be landed in the 8⅜-in. hole section. This required building inclination from vertical (0°) and landing the well at 80° inclination. Then, 4,000–5,000 ft of a 5⅞-in. hole lateral section would be drilled while holding 80° inclination or occasionally building to 90° inclination. Several initiatives had been implemented with the aim of optimizing drilling performance but had not experienced meaningful success in tackling vibration issues. Design Background An analysis of more than 100 horizontal wells drilled on the project revealed that 35% of total well time was consumed in the 8⅜-in. hole section. The majority of this time was spent on slow drilling or remedial operations. It was imperative that the proposed engineered drillstring meet the following requirements: - Able to drill through highly abrasive and interbedded formations - Maintain stability to avoid or reduce stick/slip, shocks, and vibration - Address surge and swab concerns - Minimize exposure through reduced handling - Optimize torque and drag - Optimized based on available tubulars on the rigsite - Reduce flat time Finite element analysis (FEA) and bottomhole assembly (BHA) modeling was performed with these requirements taken into consideration in a bid to generate a fit-for-purpose BHA (Fig. 1). In the deep gas field where the study was completed, the well had to be landed in the reservoir formation and maintain the 5⅞-in. lateral across the entire pay zone. A critical analysis of the formation determined that compressive strength exceeded 30,000 psi and that the formation was highly abrasive. A complete review of the drilling system was completed to optimize the approach to be taken.

Publisher

Society of Petroleum Engineers (SPE)

Subject

Strategy and Management,Energy Engineering and Power Technology,Industrial relations,Fuel Technology

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3