Intermittent Gas Lift Used in Hydrate Mitigation and Flare Reduction in Algeria

Author:

Carpenter Chris1

Affiliation:

1. JPT Technology Editor

Abstract

This article, written by JPT Technology Editor Chris Carpenter, contains highlights of paper SPE 191542, “Hydrate Mitigation and Flare Reduction Using Intermittent Gas Lift in Hassi Messaoud, Algeria,” by Ala Eddine Aoun, SPE, Faouzi Maougal, and Lahcene Kabour, Sonatrach, and Tony Liao, SPE, Brahim AbdallahElhadj, and Sabrina Behaz, Halliburton, prepared for the 2018 SPE Annual Technical Conference and Exhibition, Dallas, 24–26 September. The paper has not been peer reviewed. Hassi Messaoud is a mature oil field with more than 1,100 production wells. Approximately half of the wells are natural flow and the other half use continuous gas lift (CGL) with concentric (CCE) strings. To reduce the usage of the high volume of lift gas, intermittent gas lift (IGL) was selected in a pilot project to evaluate its applicability in the field for wells characterized by high gas/oil ratio (GOR) and without continuous concurrent water injection (with lift gas) to dissolve salt•deposited•downhole. Production Overview Field production began in 1957. During the first 20 years, all production wells were naturally flowing; in 1980, gas lift was introduced into the field development and has remained the only artificial-lift method. Electrical submersible pumping systems have been introduced into the field recently. Of the production wells, 795 are flowing while 376 are shut in for a variety of reasons. Among the flowing production wells, 409 are naturally flowing and 386 are artificial-lift wells. Production fluids are processed by 25 separator stations throughout the field. Gas usually is compressed first at the satellite level; then, at the central processing facilities, the gas is further compressed to the pressure required for injection into the reservoir. Water is treated by the addition of surfactants. The treated water is pumped into the water-injection network to be used in both reservoir-pressure maintenance and salt wash in wells. In the field’s first years, the oil-production rate increased quickly as the number of wells grew. Since 2007, oil production has declined quickly in naturally flowing wells. The steady increase in oil production from gas-lift wells offset the fast production decline in the full field. However, the oil production from gas-lift wells has leveled off during the past 2 years, while the production from naturally flowing wells recovered slightly. The gas lift wells contribute approximately 40% of the field production. Combined Gas Network for•Reservoir Gas Injection and Gas Lift A specific challenge of the Hassi Messaoud field operation is the highly complex gas network, in which the gas-lift network is attached to the gas- injection network for reservoir-pressure maintenance. The gas lift was grown organically out of the reservoir gas-injection network. Initially, when only a small number of wells needed gas lift, this approach might have been cost- effective, but the increasing number of gas-lift wells meant that different methods had to be•considered.

Publisher

Society of Petroleum Engineers (SPE)

Subject

Strategy and Management,Energy Engineering and Power Technology,Industrial relations,Fuel Technology

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3