HARADH-III: Industry's Largest Field Development Using Maximum Reservoir Contact Wells, Smart Well Completions and I-field Concept

Author:

Al-Kaabi Abdulaziz Ubaid1,Afaleg Nabeel1,Pham Tony Reuben1,Al-Muallem A.S.,Al-Bani Fahad Abdullah1,Hart Rick1,Hembling Drew E.1

Affiliation:

1. Saudi Aramco

Abstract

Abstract The development of Haradh-III in the Southernmost area of Ghawar represents a major shift in paradigm in terms of the combination of the technologies. The field development combines four main technology features which include maximum reservoir contact (MRC) wells, smart completions, extensive use of real-time geosteering and I-field initiatives. This paper describes the motivation, implementation, and post-production evaluation of this unique field development. In the case of Haradh-III, field development with smart MRC wells delays water encroachment, improves flood front conformance and recovery, lowers water production and long term development and operating costs. Bottom water encroachment into the wellbore is mitigated as down-hole Internal Control Valves (ICV), as part of the smart completion, are adjusted. This in turn lengthens the life of the well, allows sweep and recovery to take place in the reservoir below the horizontal wellbores through the most effective sweep process: the replacement mechanism by gravity. The objectives of the development are accomplished utilizing a reduced number of wells, minimizing the accompanying infrastructure therefore lowering the capital expenditure while reducing the operating cost by maintaining, on a long-term basis, a low-water producing system, all occurring in real-time and within the I-field environment. Introduction Production from Haradh-III development started in February 2006. The project included a combination of MRC wells, smart completions, geosteering, and I-field concept which provides real time access to down hole information. The efficient integration along with understanding of the fluid flow mechanisms in the reservoir was the key to the success of the project. Haradh field locates at the Southernmost portion of the Ghawar complex and covers an area 75 Km long and is 26 Km at its widest section (Fig. 1). The field consists of three sub-segments of approximately equivalent reserves, with an aggregate Oil Initially In Place in the order of tens of billions of barrels. Initial production from Haradh-I started in May, 1996, followed by Haradh-II and Haradh-III in April, 2003 and February, 2006, respectively. The field developments, occurring over a span of a decade, offer a unique opportunity in gauging the impact of technologies. Haradh-I was developed exclusively by utilizing vertical wells, whereas horizontal completions provided the primary configuration for producers/injectors in Haradh-II. Haradh-III, the main focus of this paper, was developed by relying mainly on smart MRC completions (Fig. 2) within an I-Field framework. The total Haradh production capacity is 900 MBD, with equal contributions from the three respective sub-segments I, II and III with key statistics for Haradh-III as shown in Table-1.1

Publisher

SPE

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3