Technology Focus: Well Integrity (January 2015)

Author:

Santos Otto Luiz Alcantara1

Affiliation:

1. Petrobras

Abstract

Technology Focus Cementing operations represent one of the more critical aspects concerning well integrity. Despite the large amount of research and the huge number of operations throughout the years, the industry still faces well-integrity problems during and after cementing operations. These occurrences have been experienced by the petroleum industry worldwide and can happen at any moment of the well life cycle, from the drilling phase to abandonment after the well’s production life. Here, I have categorized these well-integrity issues according to the moment at which they manifest: during the cement displacement inside the well (minutes); after the cement placement (hours to days), and after the cement has been cured (months to years). The first category may result in serious well-control problems, including blowouts (the Macondo blowout was related to cementing operations). According to a survey published by the former Minerals Management Service, during the period between 1992 and 2006, the leading factor contributing to blowouts in the US offshore area was cementing (18 out of 54 blowouts reported). These well-control problems are normally caused by improper design of the cementing operation in terms of hydrostatic pressure of the cement slurries or preflushes, failure when mixing the cement slurry to achieve its planned density, lost circulation during the cement displacement, or failure of casing float equipment. In my opinion, well-control courses must dedicate more time to discussing well-control problems during cementing operations. The second category encompasses those issues normally associated with the loss of hydrostatic pressure of the cement slurry during its initial hydration period and consequent gas flow inside the annulus. This condition also can cause well-control problems, pressure buildup in the annulus between casing strings, and zonal-isolation problems later on. The industry has several ways to mitigate these occurrences that include, but are not limited to, the use of gas-block additives, the design of cement slurries with short transition times, the application of surface pressure on the annulus, the use of external casing packers, and the implementation of multistage cementing operations. Despite the application of these mitigation measures, annular gas flow after cementing is still a recurrent problem, and remedial solutions are normally expensive and difficult. The last category refers to long-term problems normally caused by poor cementing practices, with detrimental effects on zonal isolation. Inadequate drilling-mud removal during the cement-slurry displacement in the annulus, insufficient cement height that may lead to casing leakage and corrosion problems, and the channels that result from the gas flow previously mentioned are some of the factors that can contribute to long-term well-integrity failures. Again, remedial solutions are normally expensive. JPT Recommended additional reading at OnePetro: www.onepetro.org. IPTC 16592 Mitigation of Deepwater Shallow Hazards With Simplified Cement System: South China Sea Case Study by Todd B. Ellis, Baker Hughes, et al. OTC 24369 Well-Integrity Analysis Applied to Workover Prediction by T.C. da Fonseca, Petrobras, et al. SPE/IADC 163474 Automated Alarms for Smart Flowback Fingerprinting and Early Kick Detection by Tarab H. Ali, Baker Hughes, et al.

Publisher

Society of Petroleum Engineers (SPE)

Subject

Strategy and Management,Energy Engineering and Power Technology,Industrial relations,Fuel Technology

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. A Simple Classification of Wellbore Integrity Problems Related to Fluids Migration;Arabian Journal for Science and Engineering;2021-01-27

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3