Graph-Based Temporal Process Planning and Scheduling for Well Drilling Operations

Author:

Pavlov Maksimilian1,Bukhanov Nikita2,Safonov Sergey2

Affiliation:

1. Skolkovo Institute of Science and Technology, Aramco Innovations LLC

2. Aramco Innovations LLC

Abstract

AbstractWell construction is the most expensive stage of oil field development. Oil and gas companies carefully calculate all possible expenditures to assure that the project of well construction and exploitation will be profitable in time. The time for every operation of well construction is strictly regulated. However, in different oil and gas companies time allotted, for example, cementing surface casing or tripping operations can differ significantly. Therefore, some oil and gas companies are unable to calculate their well construction expenses accurately and lose a significant amount of money, which can be reduced. Also, engineering teams spend a substantial amount of time developing a drilling plan for the drilling crew, which may also be fully or partially developed by automated means. We present a data-driven approach for automatic planning and scheduling of drilling operations on wells with similar design and geological characteristics, suggesting also an improved operation classification based on the IADC dictionary of drilling operations.The model for drilling operations planning is based on the directed graph traversal and process mining techniques. The algorithm takes as an input an undetailed plan, the section which is planned to be drilled, and the phase of well construction (drilling, cementing, logging). The algorithm selects the shortest path between two adjacent operations, gathers all paths together, and outputs a detailed plan with the corresponding time for each operation. For directed graph construction, we processed about 15 drilling reports from wells of a particular oil field which have similar well design and geology conditions by virtue of their geological proximity.Algorithm performance was estimated by comparing graph time against similar plan time which was calculated based on the median time of every operation in a whole dataset. Median time (P50 percentile) was used because it demonstrates objective time in terms of well construction operations. We conjecture the above based on the fact that in some cases time for tripping can be faster or slower in some wells due to geological or other conditions, and the median provides an outlier-robust estimate of the average value. Also, graph time was compared between the engineering team's proposed plan and the actual time from drilling reports. Graph construction quality was estimated using three principal metrics: the Jaccard coefficient, structural distance, and fitness similarity.

Publisher

SPE

Reference13 articles.

1. PATHATTACK: Attacking Shortest Paths in Complex Networks;Miller,2021

2. Shortest paths in a dynamic uncertain domain.;Blei,1999

3. A Drilling Scheduling Toolbox For Oil and Gas Reservoirs;Tavallali;12th International Symposium on Process Systems Engineering and 25th European Symposium on Computer Aided Process Engineering,2015

4. Ylamarty, Harclerode. 2022. Automated Optimization of Composite Well Analysis from Best-In-Class Offset Wells Using Cloud-Based Analytics. SPE Unconventional Resources Technology Conference, Houston, Texas, USA. DOI: https://doi.org/10.15530/urtec-2022-3723864

5. Using Bayesian Network to Develop Drilling Expert Systems;Al-Yami;SPE Heavy Oil Conference and Exhibition,2016

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3