Abstract
Abstract
A programme of boreholes to depths up to 2000 m for the investigation of potential sites for the UK national repository for the disposal of low and intermediate level radio active waste included the requirement for high quality continuous coring through a range of geologies, a 159 mm (6-1/4 in) minimum diameter hole for a comprehensive wireline logging programme and a suite of testing both during drilling and at the end of each borehole interval. These special requirements prompted the adoption of a blend of oilfield, prompted the adoption of a blend of oilfield, mining and geotechnical exploration equipment and procedures to achieve the various objectives within the quality standards.
Three rigs have been used at sites at Sellafield, Cumbria, England and Dounreay, Caithness, Scotland. At Sellafield, two intermediate depth standard diesel electric oilfield land drilling rigs were modified to include hydraulic top drives, wireline coring winches, small triplex coring pumps integrated with a secondary mud system dedicated to coring, electromagnetic flowmeters to monitor in and out flows and an improved, more sensitive automatic drilling system than is normally fitted to this class of rig. At Dounreay, a large hydraulic top drive mining exploration rig was used which included a pipe handling robotic device to improve trip speed.
Continuous coring was carried out on all rigs with a 139.7 mm (5-1/2 in) heavy duty mining wireline drilling system with 159 mm (6-1/4 in) bit diameter and 100 mm (4 in) nominal core diameter with the use of uPVC corebarrel liners to protect the core and assist in surface handling to minimise disturbance. During drilling, environmental pressure measurements were taken at intervals of about 50 m to determine the in situ environmental pressure profile and on the completion of each interval of drilling, a suite of straddle and full sector tests were carried out after a comprehensive wireline logging programme. A comprehensive quality programme. A comprehensive quality assurance programme is in operation.
The boreholes were opened after each interval had been cored and tested to allow standard oilfield casing up to 508 mm (20 in) diameter to be installed and cemented. Hole opening was carried out using conventional hole openers and rock bits with mud flush and with down-the-hole hammers and air or foam flush in the stronger rocks.
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. Geotechnical investigations for a deep radioactive waste repository: drilling;Geological Society, London, Engineering Geology Special Publications;1996