Diagnosing Production Problems With Downhole Video Surveying At Prudhoe Bay

Author:

Ward Stephen L.1,Allen Thomas T.1,Chavers Raymond D.2,Robertson Thomas N.2,Schultz Philip K.3

Affiliation:

1. Arco Alaska Inc.

2. Halliburton Energy Services

3. Westech Inc.

Abstract

Summary This paper describes a real-time, fiber-optic downhole video (DHV) system and its use as a diagnostic tool in solving production problems in Prudhoe Bay wells. Recent developments in lens preparation technology and advancements in the application of electro-fiber-optic cable have proved the viability of DHV surveying in oilfield applications. This paper presents case histories of the first field applications in which the fiber-optic DHV system was used to perform downhole visual inspections of tubulars and casing. These operations determined fluid entry under flowing conditions, verified tubing and casing integrity, and facilitated wireline fishing operations. The fiber-optic system provided more comprehensible identification capabilities and other operational advantages than obtainable with alternative methods of downhole diagnostic techniques or the DHV coaxial-cable systems. This paper also overviews the enhancements made since the first applications of fiber-optic cable. Introduction Until recently, real-time DHV systems relied on specialized, large-diameter, 9/16-in. coaxial cable to transmit to surface the high data rates required for real-time video during surveys in wells of significant depth. These coaxial systems had to be used in wells with little or no surface pressure because of operational difficulties in maintaining pressure control with the large-diameter cable required for data transmission. A new electro-fiber-optic cable provides DHV systems with greater surveying capabilities. The new cable design consists of a 50/125u multimode fiber encapsulated in a 0.046-in.-diameter stainless-steel tube. Copper conductor wires over the tube provide a DC resistance of 8 ohms/1,000 ft. Although the cable appears to be identical to other 7/32-in.-diameter well surveying cables, its optical telemetry provides about a 50% increase in bandwidth compared with 9/16-in.-diameter coaxial cable. The cable has a breaking strength of 4,700 lbf, a working load rating of 1,200 lbf, a minimum radial bend of 12 in., and a conductor voltage rating of 300 V DC. As Fig. 1 shows, the sinker weight required for a 7/32-in.-diameter cable is 80% less than that required for a 9/16-in.-diameter cable. The 60% size reduction in cable diameter was instrumental in making DHV surveying possible in high-surface-pressure environments. The second factor that had compromised earlier DHV systems was their limited capability to obtain quality surveys in opaque fluids. This problem has been solved with the development of a unique, highly specialized surfactant that, when properly applied, repels oil and inhibits condensation. The surfactant is now being used on the camera lens and light domes to allow viewing of wells on production. Before the development of the new surfactant, many other products (detergents, phosphates, petroleum-based coatings, acidified ethanol/isopropanol polish, and myriad other wetting agents) had been tried but were only marginally successful. The new surfactant, which is polished into the glass surface to prohibit oil adherence to the camera lens and light domes, has permitted viewing for more than 8 hours in wells with high oil concentration without the oil adhering to the camera lens and obstructing the video picture. Even after the system had traversed thousands of feet through a column of oil, visual clarity returned when a clear medium was encountered.

Publisher

Society of Petroleum Engineers (SPE)

Subject

Strategy and Management,Energy Engineering and Power Technology,Industrial relations,Fuel Technology

Cited by 4 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Cross-linked and responsive polymer: Gelation model and review;Journal of Industrial and Engineering Chemistry;2023-03

2. Water shutoff and conformance improvement: an introduction;Petroleum Science;2021-02-04

3. Periodic Wellbore-Water Accumulation and Off-Take;Energy Exploration & Exploitation;2001-10

4. Advances in borehole imaging technology and applications;Geological Society, London, Special Publications;1999

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3