Plug and Abandonment for Gas Wells: A Case Study from Baghjan Oilfield, India

Author:

Bharadwaj Rishabh1,Kumari Bhavya1,Patel Astha1

Affiliation:

1. Indian Institute of Petroleum and Energy

Abstract

Abstract The economic end of the life-cycle of a well is dynamic and it varies with the oil & gas market conditions and advances in extraction technologies. If production declines or the need for a workover arises, plugging and abandonment operations are followed. In case the wellsite has encountered accidental releases, systematic abandonment and remediation becomes even more crucial to avoid further environmental damage and capital investment. This paper analyzes the Baghjan oilfield blowout of the Assam-Arakan basin and provides abandonment practices for gas wells. The mobile workover rig was stationed at the Baghjan Well-5 with the aim to plug the lower producing zone at 3871 m and complete the well in the upper Lakadong+Therria sand at a depth of 3739 m. Baghjan Gas Well No.5 blew during the temporary abandonment which was planned to mitigate the leakage in the wellhead. Improper depth for the placement of cement plug, failure to check the plug integrity, and shortcomings in the regular inspection of annular casing pressure led to the well control situation at the Baghjan gas well. While pulling out the tubing conveyed perforation gun after perforating the Lakadong+Therria I+II sand, Shut-In Tubing Pressure of 4400 psi and 3900 psi Shut-In Casing Pressure was observed which indicated a leak in the Tubing Seal Assembly. The well was killed with a 9.76 lbm/gal sodium formate brine and in the middle of pulling the tubing, leakage in the W.F. Spool was identified which changed the priority of the operations. Therefore, a temporary abandonment operation was planned to mitigate the leakage problem in the primary and secondary seals, during which the well started flowing gas profusely after nipple-down of the blowout preventer. The shortcomings of the abandonment process can be conquered by the selection of an appropriate isolation material such as resin-based sealants or bismuth and thermite, which shall act as a primary barrier and provide enhanced zonal isolation. The isolation material should mitigate micro-fractures, minimize treatment volume and fluid loss, provide ample pumping time, and not degrade in the presence of wellbore fluids. The study discusses resin-based sealants, cement slurry designs, advances in conventional, unconventional, and rigless abandonment techniques, and suggests the most efficient method for the temporary and permanent abandonment operations to avoid further such incidents in the oil and gas industry.

Publisher

SPE

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3