Experimental cycle air cooling system for gas microturbine unit

Author:

Katenev G. M.1,Tumanovskii V. A.1,Stepanova T. A.1

Affiliation:

1. National Research University Moscow Power Engineering Institute (NRU MPEI)

Abstract

The article considers the Combustion Turbine Inlet Cooling (CTIC) system — an experimental system for cooling the cycle air entering the gas microturbine unit. This enables to save electrical power of the unit generated at the design level in the period of seasonal increase in air temperature. Cooling of the air at the inlet to the turbocharger of the unit occurs up to its design temperature (which is, according to the ISO standard, equal to 15˚С). The basis of the CTIC model is an industrial cooling system based on a vapor compression refrigeration unit with a cold accumulator. Water ice is used as a cold storage medium in the accumulator, while ice water is used as a medium cooling the cycle air (ice water is water at a temperature of 0.5˚С – 1˚С). The eff ect of cooling of cycle air is achieved by pumping ice water coming from the cold accumulator through an air-to-water heat exchanger installed at the inlet to the turbocharger. The purpose of the study was to determine the operating time of a cold accumulator, depending on the speed of the circulating water. The experiments were carried out on a model of a cooling system with a cold accumulator having a 200 kg ice storage and working with the Capstone C-30 microturbine. Maintaining the temperature of the cycle air at its design level is achieved using a frequency-controlled circulation pump and a digital measurement and control system with the LabVIEW software package. The results of the study show that the considered CTIC system, while discharging the cold accumulator, is able to maintain the required design temperature of the cycle air at 15°C for 6 hours, which is quite enough to cover the peak load of the working day. Technical and economic parameters of the plant are evaluated.

Publisher

NPO Energobezopasnost

Reference10 articles.

1. Product Specification Model C30 Capstone MicroTurbine, 460000 Rev. J. (December 2010): [Electronic resource.] // Capstone Turbine Corporation. URL: https://www.capstoneturbine.com/ (Date of asking: 28.04.2018.)

2. Friedrich M., Armstrong P. R., Smith D. L. New technology demonstration of microturbine with heat recovery at Fort Drum, New York. Pacific Northwest National Laboratory Richland, Washington 2004.

3. Punwani D. V. Turbine inlet cooling case study for an industrial CHP system for multiple buildings in the Midwest. Intern. District Energy Association Annual Conf. Chicago, Illinois, June 2012.

4. Buecker B., Mieckowski C. Turbine Inlet Air Cooling Cutting Edge Technology. Power Engineering. April 2012; 116(4): 58–62.

5. Hany A. Al-Ansary, Jamel A. Orfi, Mohamed E. Ali Impact of the use of a hybrid turbine inlet air cooling system in arid. Climates Energy Conversion and Management 2013; (75): 214–223

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3