Abstract
<p>Combined with the reconstruction project of underground locomotive transportation system in Guqiao Coal Mine of Huainan Mining Group, the dissertation studies the comprehensive management system of coal mine locomotive transportation. The accuracy of ZigBee wireless positioning technology is improved through Gaussian filtering to make it applicable to more complex underground coal mine environment. Frequency conversion control is used in the motor control circuit to realize real-time calculation of the running speed of the locomotive. By analyzing the control scheme of the turnout and traffic lights, the explosion isolation and essential safety control sub-station suitable for gas mine are designed. Communication platform construction of the system is realized through wireless base station of Benan mine and industrial network of coal mine. System relevant data can be uploaded to the ground dispatching center in real time, so that the scheduling staff can reasonably arrange the scheduling tasks in a timely manner. The optimized logistics management and storage management system makes the material dispatching and transportation more reasonable and scientific. Through the analysis of the running data, the construction and personnel management of the locomotives are realized.</p>
Publisher
Universe Scientific Publishing Pte. Ltd.
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献