Abstract
In a first system configuration, a dedicated 50G-PON module was incorporated into the OLT, seamlessly coexisting with commercial G-PON and XGS-PON. The coexistence of the three generations of PONs is done here without adding any loss (filter) in existing ODNs, the 50G-PON being inserted on a 2:2 splitter at the CO. Furthermore, the possibility to extend the reach and place the 50G-PON OLT in a remote CO is evaluated. The second system uses a MPM at the OLT that includes the three PON generations. To our knowledge, this is the first full G-PON, XG(S)-PON, 50G-PON system prototype that provides an optical budget of 29 dB, and we demonstrate the possibility of extending the budget to 35 dB using SOAs.
Reference13 articles.
1. Network operator upgrade opportunities with 50G-PON;Zhang,2023
2. An operator’s approach on the coexistence in future optical access networks;Saliou,2023
3. Achieving high budget classes in the downstream link of 50G-PON
4. Record high power 13dBm electro-absorption modulated laser for 50G-PON;Dubrovina,2022
5. Uncooled high speed Ge/Si avalanche photodiode for 50 Gbit/s-PON with 60 km reach;Potet,2023
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. Key Technologies for the Next Generation Coherent Passive Optical Network;2024 22nd International Conference on Optical Communications and Networks (ICOCN);2024-07-26
2. Introduction to the ECOC 2023 Special Edition;Journal of Optical Communications and Networking;2024-06-25