Improve Ramp-Up Performance on the Sewing Process in a Sports Shoe Factory Using 8-Disciplines and Lean Manufacturing

Author:

Setiawan LuckyORCID,Hasibuan SawarniORCID

Abstract

Purpose: The research aims to design a performance improvement framework for a new model of sports shoes to increase the ramp-up process time. Methodology/Approach: The approach used the problem-solving system of 8 disciplines, Single Minute Exchange Dies, Visual Management, and the Just In Time principle. Findings: By using the methods described above, the research findings will have a positive impact on the company. Model changeover time was reduced from 600 minutes to 102 minutes, and ramp-up time was reduced from 20 days to 2 days. Research Limitation/Implication: The limitation of this study was that only the CK2946 model was still done as a case study. The cost and other inhibiting factors were also not included in the discussion of this rump-up process. Originality/Value of paper: By integrating SMED, Just In Time, visual management, and using 8-Dicipline, the researcher developed a framework for improved performance for ramping up a new model of sports shoes.

Publisher

Technical University of Kosice, Faculty of Materials, Metallurgy and Recycling

Subject

Management of Technology and Innovation,Strategy and Management

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3