Affiliation:
1. Mosinzhproekt
2. Moscow State University of Civil Engineering (National Research University) (MGSU)
Abstract
Introduction. One of the serious problems in the construction of underground structures in a dense urban area is the occurrence of excess deformations of the foundations of operating buildings that fall into the zone of influence of underground construction. The subject of the study was the calculated justification of the modern technology of compensatory injection. The relevance of the task is determined by the fact that the choice of the most effective protection technology should be based not only on a comparison of technological precipitation with maximum permissible values, but also on the assessment of the possibility of monitoring and controlling the movements of the foundations of buildings and structures during construction and subsequent operation. The purpose of the study was to compare various methods of protecting the foundations of existing buildings and structures and justify the selection of the most effective of them for further implementation and dissemination in the design and construction of urban underground structures.
Materials and methods. On the basis of the survey data of the operated building falling into the impact zone of excavation of the pit for the construction of the installation and shield chamber of the subway, the parameters of the stress-strain state of its foundations are studied by mathematical modeling. The problem was solved by the finite element method based on the software and computer complex Z_Soil v.18.24.
Results. Based on the analysis of the results of the examination of the administrative building using the finite element method, a change in the parameters of the stress-strain state of the foundations was modeled with various technologies for strengthening it. In the course of solving the geotechnical problem, it was found that the minimum impact on the foundations of the building during the construction of the pit was obtained in the method of compensatory injection. The system of criteria for making a decision on choosing an effective way to ensure the suitability of buildings in the underground construction zone for operation is substantiated.
Conclusions. The results of this work can be used to justify the choice of technology for prevention and control of excess deformations of foundations. The function for calculating the volume of injected material in the Z_Soil software and computer complex can be used to justify the consumption of materials and the economic efficiency of the technological solution.
Publisher
Moscow State University of Civil Engineering
Reference29 articles.
1. Kharchenko I., Zertsalov M., Simutin A., Harchenko A. Basic calculation and technology of control of strain-stress soil conditions by compensation grouting. Metro and tunnels. 2015; 5:20-23. (rus.).
2. Yin Z.Z. Application of hydrostatic leveling system in metro monitoring for construction deep excavation above shield tunnel. Applied Mechanics and Materials. 2013; 333-335:1509-1513. DOI: 10.4028/www.scientific.net/AMM.333-335.1509
3. Shen X., Lu M., Mao S., Wu X. Integrated approach to machine guidance and operations monitoring in tunnel construction. The 31st International Symposium on Automation and Robotics in Construction and Mining (ISARC). 2014; 103-109. DOI: 10.22260/isarc2014/0014 URL: http://www.iaarc.org/publications/fulltext/isarc2014_submission_78.pdf (date of the application 05.03.20)
4. Dremov V.I., Mazein S.V., Prudnikov A.D., Akutin D.V. Projected industrial safety activities in the Moscow subway construction. Metro and tunnels. 2016; 5:31-38. (rus.).
5. Dement'eva M.E., Utkin R.M. Features of exploitation of underground facilities in the far north. International scientific seminar on modern construction technologies and materials: сollection of materials of the international scientific conference. 2017:814-817. (rus.).