Current issues of improving the pricing system in construction in the transition period

Author:

Solov'ev Vyacheslav V.1ORCID,Korchagin Alexey P.2

Affiliation:

1. Directorate for complex reconstruction of Railways and construction of railway transport facilities-branch of JSC “Russian Railways”

2. Moscow State University of Civil Engineering (National Research University) (MGSU)

Abstract

Introduction. The focus on transition to the input method of estimated cost accounting, demonstrated by the leaders of the construction industry, outlines the principal goals pursued in the process of improving the pricing system. The monitoring of prices for construction resources gains in importance. The research is based on the analysis of the construction industry’s current need for updated regulatory information and an improved pricing methodology. Materials and methods. A relevant problem of pricing, which is now quality-driven, has been solved by the construction industry amidst the strengthening role of government agencies. Presently, pricing is driven by the factors that characterize the course of an investment process, primarily, promoted by the customer. This methodology encompasses the assessment of pricing regulations with a required extent of generalization in terms of any submitted data. Results. The experiment conducted to assess the established pricing regulations in terms of special construction facilities has proven the maximal significance of factors, describing a construction project stage as a correlation between estimated and actual costs incurred by a construction company. Against the background of impeded introduction of changes into costing standards, a pool of solutions has been generated to monitor prices for construction resources and to generate price escalation models. Conclusions. The best methods used to adapt standard prices to actual costs of construction products should involve the monitoring of prices for the whole range of construction resources. Methodological problems are to be solved in a way that must improve the trustworthiness of estimated construction costs. The novelty and practical significance of this research stem from the analysis of the current development stage of the system of federal and industry-specific regulations and methodologies.

Publisher

Moscow State University of Civil Engineering

Reference30 articles.

1. Ardzinov V.D. Problems and risks of reforming pricing and budget rationing in construction. Proceedings of the scientific and practical conference with international participation RYASKE-2018. Edited by S.G. Oparin. 2018; 353-363. DOI: 10.18720/SPBPU/2/id19-52 (rus.).

2. Solov'ev V.V., Korchagin A.P. Ways to improve the quality of pre-project activities in Russian Railways. Economy of Railways. 2014; 3:21-26. (rus.).

3. Bashirov A.E., Rubchenko D.S., Kurbackaya E.P.About pricing in the construction of railway facilities. Economy of Railways. 2012; 6:34. (rus.).

4. Solov'ev V.V. Economic indicators of the use of machines in construction. Bulletin of the Moscow international higher school of business MIRBIS. 2019; 1(17):184-194. DOI: 10.25634/MIRBIS.2019.1.22 (rus.).

5. Solov'ev V.V., Kuznecova A.E. Modeling of cost standards for railway construction objects. Economy of Railways. 2016; 12:44-51. (rus.).

Cited by 8 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3