Interaction between a long pile and the multilayered soil body with account for elastic and rheological properties as well as soil stabilization

Author:

Ter-Martirosyan Zaven G.1ORCID,Akuleckij Aleksandr S.1ORCID

Affiliation:

1. Moscow State University of Civil Engineering (National Research University) (MGSU)

Abstract

Introduction. When the footing is embedded in loose clayey soils, buildings may settle down for a long period of time. The projected settlement period is of great importance for the design of foundations designated for such soils. Therefore, the approach to describing the process of foundation settlement must be considered as rheological. This article addresses the setting of and a solution to the problem of interaction between a long pile and surrounding multilayered and underlying soils with account taken of the rheological properties of the surrounding soil body. The creep process is considered with account taken of stabilization. Materials and methods. Linear problem setting is considered. The analytical method is employed to present a solution. The rheological stabilization parameter is used to describe the creep process. Results. An expression is derived to determine the reduced shear modulus for the multilayered soil body. The relationship between the value of the force applied to the pile toe and the time is derived with regard for the rheological stabilization parameter. Analytical solutions are enforced by graphs in the article. Graphs describing the relationship between pile settlement, the force applied to the toe of the pile, passing through alternating soil layers, and the time are provided for various values of viscosity and the variable parameter of stabilization. Conclusion. Solutions, obtained by the co-authors, are used to perform the preliminary identification of displacement of long piles and surrounding multilayered underlying soils. The rate of stress changing underneath the pile toe depends on soil viscosity. The rheological coefficient of stabilization has a major effect on the time of pressure stabilization underneath the pile toe, as well as the time of the pile settlement stabilization. Dependencies, derived in this article, make it possible to project the future settlement pattern.

Publisher

Moscow State University of Civil Engineering

Reference25 articles.

1. Abelev M.Yu., Abelev K.M. Geotechnical studies of construction sites on soft water-saturated clay soils. Geotechnics. 2010; 6:30-33. (rus.).

2. Ibragimov M.N., Semkin V.V. Consolidation of soils by injection of cement mortars: monograph. Moscow, ASV Publ., 2012; 256 (rus.).

3. Broyd I.I. Jet Geotechnology: a study guide for students. Moscow, ASV Publ., 2004; 440. (rus).

4. Malinin A.G. Jet grouting of soils. Moscow, Stroyizdat, 2010; 165. (rus).

5. Garassimo A. Design Procedures for Jet-Grouting. Seminar onjet grouting. Singapore, 1997.

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3