A system of key indicators enabling the forecasting of changes in the capital costs of a construction project

Author:

Vlasov Dmitry A.12,Gabrielov Alexander O.1ORCID

Affiliation:

1. National Research University Higher School of Economics (HSE University)

2. United Metallurgical Company

Abstract

Introduction. Reduction of project cost overruns is a key objective of Russian production facilities against the background of tightening domestic and international market competition, a spike in the number of projects implemented within the framework of the investment programme, including large strategic investment projects, scarcity and high costs of sources of financing. The mission of this research is to offer an approach to the development of a system of key risk indicators of an construction project that will allow the management team to make decisions ahead of the occurrence of risk-bearing events to reduce cost overruns and to stay within the pre-set budget values in terms of capital costs of a project. Materials and methods. The co-authors have analyzed currently used approaches, instruments and methods, applicable to the development of the system of key project indicators, and classified project risks using the Ishikawa diagram. Their approach encompasses instruments and methods of the risk theory (identification and assessment of risks and key project indicators), as well as instruments of the regression correlation analysis. Results. The co-authors present an algorithm for the development of a system of key risk indicators and an approach to the listing of key project indicators broken down by project significance criteria. Conclusions. The application of the proposed approach to highly significant projects will ensure a detailed project-specific listing of key project indicators applicable to monitor the project implementation. A standard set of instruments and methods, requiring minimal human resources and time, can be applied to other projects. Besides the new approach, the co-authors offer a description of a list of potential key project indicators that enable to forecast changes in capital costs, broken down by risk factors.

Publisher

Moscow State University of Civil Engineering

Reference18 articles.

1. Tice M. Key risk indicators — a link between risk management, operations and strategy. Keeping Good Companies. 2011; 63(3):153-157.

2. Beasley M., Branson B., Hancock B. Develo­ping key risk indicators to strengthen enterprise risk management. Committee of Sponsoring Organization of the Treadway Commission (COSO). 2010.

3. Scarlat E. Indicators and metrics used in the ERM. The Bucharest Academy of Economic Stu­dies. 2010; 14.

4. Baker L. Integrating key risk and performance indicators. Internal Auditor. 2016; 4.

5. Scandizzo S. Risk mapping and key risk indicators in operational risk management. Economic Notes. 2005; 34(2):231-256. DOI: 10.1111/j.0391-5026.2005.00150.x

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3