Modeling the residential buildings erection of large-sized blocks

Author:

Oleynik Pavel P.1,Pakhomova Liliya A.1

Affiliation:

1. Moscow State University of Civil Engineering (National Research University) (MGSU)

Abstract

Introduction. the development analysis of domestic residential building construction of volumetric blocks, starting from the 60s of the twentieth century to the present time, is given. It is noted the innovative nature of the transition from low- volume blocks to large-sized blocks of high and full factory readiness. The problems that have arisen in this case are indicated, of which one of the most acute is the determination of organizational and technological parameters for the construction of residential buildings. Materials and methods. the role of organizational and technological parameters of the objects’ construction is described — the duration of construction and its stages, the complexity of work, the number of workers. The content of the timing carried out by the MonArch Group of Companies for the installation of large-sized volumetric blocks of a four-story residential building in Yakovlevo–2 village (New Moscow) is revealed. The main installation operations are analyzed with an indication of the time spent on each floor and the roof arrangement. Results. based on the final results of the timekeeping materials generalization, three estimates of the duration of a building construction of large-sized blocks are proposed — pessimistic, satisfactory, optimistic. The found dependences “duration of building construction — the number of large–sized blocks installed taking into account the roof arrangement” are revealed with the corresponding calculation formulas. The formula for calculating the labor intensity of installers work and crane maintenance workers is also given. Conclusions. the prospects for the innovative technology development for the construction of residential buildings of large-sized blocks are substantiated, provided that capital investments are allocated and the efforts of research and design organizations are combined to comprehensively solve the problems that have arisen. To solve the problematic tasks of determining the indicators of organizational and technological parameters of buildings construction of large-sized blocks, an approach and methods for assessing the duration of construction and the complexity of installation work on the assembly of buildings are proposed.

Publisher

Moscow State University of Civil Engineering

Subject

General Medicine

Reference21 articles.

1. Pakhomova L.A., Oleinik P.P. Comfortable housing of the new industrial generation. Construction Production. 2020; 2:23-28. (rus.).

2. Abrahamyan S.G., Burlachenko O.V., Galda Z.Yu. Volumetric block modules as a kind of modular structures of prefabricated building systems. Bulletin of the Volgograd State University of Architecture and Civil Engineering. Series : Construction and Architecture. 2021; 1(82):5-13. (rus.).

3. Abramyan S.G., Ulanovskiy I.A. Modular construction and opportunities to use of modular structures in building superstructures. Engineering Journal of Don. 2018; 4. URL: http://www.ivdon.ru/ru/magazine/archive/n4y2018/5371 (rus.).

4. Kazakov Yu.N. Prefabricated buildings: foreign experience. Stroyprofil. 2004; 4. (rus.).

5. Asaul A.N., Kazakov Yu.N., Knyaz I.P., Erofeev P.Yu. Theory and practice of using prefabricated buildings in normal conditions and emergency situations in Russia and abroad. St. Petersburg, Humanistics, 2004; 464. (rus.).

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3