1. Testing operations for main components with diagnostic equipment in the hot cell and associated areas, G 55 MD 62 99-08-12W, ITERO Internal Document. (ITER_D_28Q2WS, www.iter.org/idm).
2. ITER Design Description Document: Cooling Water System (DDD 2.6), N 26 DDD 46 R0.2, ITER-O Internal Document.
3. Preliminary thermal and hydraulic analysis on the ITER upper diagnostic port plug during normal operation and baking;Pak;Fusion Science and Technology,2009
4. Generic upper port plug (GUPP) structure–PDR analysis summary, Diagnostic Upper Port Plug Preliminary Design Review Meeting, ITER-O, 9–10th December 2008, Cadarache, France, ITER-O internal document. (ITER_D_2FHEXU, www.iter.org/idm).
5. ITER Materials Properties Handbook (MPH-IC): Austenitic steel 316L(N)-IG AA04, G 74 MA 16, ITER-O Internal Document.