1. Allowable coolant velocity N26 DDD 9 98-06-08 W0.2.
2. Design Description Document: Cooling Water System (DDD26), N26 DDD 46 R0.2, July 2004.
3. F. Elio and X. Wang, Design of the blanket shield module for the diagnostic plugs in the equatorial ports’ (ITER IT Garching), (ITER IDM not referenced).
4. C.I. Walker, Review the Designs developed in the IT for the Representative Equatorial Port Plug 18-12-2005, ITER_D_22MGM6, www.iter.org/idm.
5. ENEA Draft Final Report on ITER Diagnostic Port Integration Contract FU06 CT 2004-00172, (EFDA /04-1209).