1. L.V. Boccaccini, Design Description Document, FZK Report, December 2005.
2. L. Boccaccini, Design Requirements for the TES, Technical Note, July 2007.
3. I. Ricapito, Tritium Recovery in the HCPB blanket for ITER and DEMO Reactors, Technical report for FZK, order n. 325/20260378/HVT, March 2004.
4. A novel short-cut design method for adsorbers used in gas dryers and dehumidifiers;Daud,2001
5. Study on tritium accountancy in Fusion DEMO Plant at JAERI;Nishi;Fusion Engineering and Design,2006