1. S. Chiocchio, et al., Project Requirements, ITER_D_27ZRW8, v4.6.
2. D. van Houtte, ITER machine operation availability, ITER_D_34GC2G, v1.0.
3. Optimization of the availability of the core-CXRS diagnostic for ITER;Klinkhamer,2010
4. D. Johnson, UPP Diagnostic requirements, ITER_D_2FCWAJ, v1.0.
5. Upper port plug handling cask system assessment and design proposals;Pustjens,2010