1. ITER Documentation, Project Integration Document PID V.3, 2007, pp 41 & 236–244.
2. ITER Documentation, Design Description Document DDD 2.7 Thermal Shields, 2004, pp. 12–15.
3. V. Kalinin, ITER Documentation, Design Description Document DDD 3.4 Cryoplant and cryodistribution, 2004, pp. 20–40.
4. Cryogenic subsystem to provide for nominal operation and fast regeneration of the ITER primary cryosorption vacuum pumps;Kalinin,2003
5. Assessment of the ITER dwell pump down;Wykes,2005