1. EAST machine assembly and its measurement system;Wu;Fusion Eng. Des.,2005
2. Z. Chen, The machine diagnostics, Bulletin of the National Mega-Project—the EAST Superconducting Tokamak Progress, 2005, pp. 27–34.
3. Y. Wu, The test facility and the superconducting coil tests, Bulletin of the National Mega-Project—the EAST Superconducting Tokamak Progress, 2005, pp. 40–41.
4. H. Bai, The cryogenic and refrigerator system, Bulletin of the National Mega-Project—the EAST Superconducting Tokamak Progress, 2005, pp. 6–42.