1. Feasibility studies of DEMO potential waste recycling by proven existing industrial-scale processes;Di Pace;Fusion Eng. Des.,2019
2. Final Report on Task SAE-3.6.2-T03-D01: “Identification of techniques for the recycling of DEMO active materials on the scale required, starting with ingots following a 50-100 year interim storage”, 14 June 2019 [EFDA_D_2MLC6W v1.0].
3. Final Report on Task SAE-3.6.2-T03 - D002: “Identification of critical aspects related active materials recycling and definition of a R&D programme”,17 January 2020 [EFDA_D_2NGC44 v1.0].
4. From pulsed to continuous wave emission in SLM with contemporary fiber laser sources: effect of temporal and spatial pulse overlaps in part quality;Demir;Int. J. Adv. Manuf. Technol.,2017
5. Fabrication and characterization of lithium orthosillicate pebbles using LiOH as a New raw material;Knitter;JAERI-Conf,2004