Author:
Litoiu Marin,Tadei Roberto
Subject
Artificial Intelligence,Logic
Reference19 articles.
1. C. Chantrapornchai, E. Tongsima, H.-M. Sha, Imprecise task schedule optimization, Proc. Sixth IEEE Internat. Conf. on Fuzzy Systems, 1997, pp. 1265–1270.
2. Fuzzy constraints in job-shop scheduling;Dubois;J. Intell. Manufact.,1995
3. Job shop scheduling with imprecise durations;Fortemps;IEEE Trans. Fuzzy Systems,1997
4. P. Gu, A. Nauman, Real time scheduling and control of manufacturing cells, IEEE Internat. Conf. on Systems, Man and Cybernetics, 1995, pp. 2148–2154.
5. H. Ishibuchi, T. Murata, K.H. Lee, Formulation of fuzzy flow-shop scheduling problems with fuzzy processing time, Proc. Fifth IEEE Internat. Conf. on Fuzzy Systems, 1996, pp. 199–206.
Cited by
16 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献