1. H. Yan, M. Li, C. Wang, Y. Liu, W. Liu, Q. Zhao, Cement Slurry System for the Long Open Hole Section of High-pressure High-temperature Deep Wells in the Sichuan Basin, SPE Gas & Oil Technology Showcase and Conference 2019, SPE – 198581–MS.
2. High temperature retarder HTR-300L for long cementing;Guo;Petrol. Explor. Dev.,2013
3. B.R. Reddy, B.K. Waugh, Biodegradable Cement Retarder Compositions and Methods of Cementing in a Subterranean Formation, US0211339, 2004.
4. W.S. Bray, A. Method of Cementing Using Polymeric Retarder, US9187373 B2, 2015.
5. E.B. Nelson, D. Guillot, Well Cementing. 2nd Edition, Schlumberger Dowell, Sugar Land: Texas, 2006.