1. Heidrun moves into construction phase-high tension for tethers;Cottrill;Offshore Engineering,1993
2. Design of TLP systems;Baadshaug,1993
3. Tensioned raft-frame design reduces TLP motions and costs;Abbott;Offshore,1994
4. Economic models;Johnston;Offshore,1988
5. How to cut deepwater field development costs by 50%;Hunter;Offshore,1994