1. Subsea Pipeline Design, Analysis, and Installation. First, Subsea Pipeline Design, Analysis, and Installation. First;Bai,2014
2. Deepwater Steel Catenary Risers Require Attention to Fatigue Factors;Albanet,2013
3. Weld efficiency factors revisited;Frith;Procedia Eng.,2015
4. Characterisation of LCF performance of X100 weld-joints: mechanistic yield strength modelling, finite element analyses and DIC testing;Long;J. Adv. Join. Process.,2021
5. Process-Structure-Property Characterisation of Plasticity and Fatigue Damage in X100 Welded Joints for Steel Catenary Risers (Ph.D. Thesis);Devaney,2020