1. Investigations on advanced materials for 700 °C steam power plant components;Speicher,2009
2. Materials development for boilers and steam turbines operating at 700 °C;Blum,2003
3. The European way to 700 °C coal fired power plant;Tschaffon,2006
4. GKM test rig: investigation of a long term operation behavior of tubes and forgings made of alloys for future high efficient power plants;Metzger,2011
5. Latest developments for the flexible high efficient power plant of the future;Gierschner;Proceedings of the 38th MPA Seminar,2012