1. IAEA Report, Nuclear safety review for the year 2012, GC(56)/INF/2, IAEA/NSR/2012, Austria, 2012. Available from: https://www.iaea.org/sites/default/files/gc/gc56inf-2_en.pdf.
2. Current issues on PRA regarding seismic and tsunami events at multi units and sites based on lessons learned from Tohoku earthquake/tsunami;Ebisawa;Nucl. Eng. Technol.,2012
3. M.D. Muhlheim, R.T. Wood, Design strategies and evaluation for sharing systems at multi-unit plants phase-I (ORNL/LTR/INERI-BRAZIL/06-01), Oak Ridge National Laboratory, USA, 2007. Available from: https://citeseerx.ist.psu.edu/document?repid=rep1&type=pdf&doi=3d85f2e79e53f8618321782e23659b54c294b9f8
4. S. Schroer and M. Modarres, An event classification schema for evaluating site risk in a multi-unit nuclear power plant probabilistic risk assessment, Reliab. Eng. Syst. Safety, no. 117, pp. 40–51, 2013.
5. On the issue of integrated risk: a PRA practitioner's perspective;Fleming,2005