1. Probability theory: the logic of science;Jaynes,2003
2. Maintenance scheduling based on two level hierarchical structure to equalize incremental risk;Chen;IEEE Trans Power Syst,1990
3. ASME. Research task force on risk based inspection guidelines, risk based inspection development of guidelines. In: General document CRTD 20-1. Washington, DC: American Society of Mechanical Engineers; 1991.
4. API. Base resource document on risk based inspection for API committee on refinery equipment. Washington, DC: American Petroleum Institute; 1995.
5. Monitoring reliability of concrete structures I: role of inspection and repair;Mori;J Struct Eng ASCE,1994