1. Garcia JM, Smith K, Lozano S, Guerrero F, Calle M. Production and delivery scheduling problem with time windows. Proceedings of the 30th International Conference on Computers and Industrial Engineering, Publishing ZITI, Tynos Island, Greece, 2002. p. 263–8.
2. A comparison of GRASP and an exact method for solving a production and delivery scheduling problem. Hybrid information systems;Garcia,2002
3. Two stage hybrid flow-shop scheduling problem;Gupta;J Oper Res,1988
4. Heuristic algorithms for the two-stage hybrid flowshop problem;Haouari;Oper Res Lett,1997
5. Sequencing with earliness and tardiness penalties;Baker;Oper Res,1990