1. Aven, T., Sklet, S., & Vinnem, J. E. (2005). Barrier and operational risk analysis of hydrocarbon releases (BORA-Release); Part I. Method description. Journal of Hazardous Materials, submitted for publication.
2. Bellamy, L. J., Papazoglou, I. A., Hale, A. R., Aneziris, O. N., Ale, B. J. M., Morris, M. I. et al. (1999). I-RISK—development of an integrated technical and management risk control and monitoring methodology for managing and quantifying on-site and off-site risks. Main Report, Contract No: ENVA-CT96-0243.
3. Botnevik, R., Berge, O., & Sklet, S. (2004). Standardised procedures for work permits and safe job analysis on the Norwegian continental shelf. SPE paper number 86629, Society of Petroleum Engineers.
4. Inherently safer chemical processes: A life cycle approach,1996
5. Layer of protection analysis simplified process risk assessment,2001