1. Andersen, H., Casal, J., Dandrieux, A., Debray, B., De Dianous, V., Duijm, N. J., et al. (2004). ARAMIS—user guide. EC Contract number EVG1-CT-2001-00036.
2. Aven, T., Sklet, S., & Vinnem, J. E. (2005). Barrier and operational risk analysis of hydrocarbon releases (BORA-Release); Part I. Method description. Journal of Hazardous Materials, submitted for publication.
3. Review from an MTO-perspective of five investigation reports from BP (Draft);Bento,2003
4. Reliability quantification of control and safety systems: the PDS-II method;Bodsberg,1994
5. Guidelines for safe automation of chemical processes,1993