1. Dietrich, W. et al. CIGRE working group 5(1983). An international survey on failures in large power transformer in service. Electra, 88, 21–42.
2. Hazard Identification using a new logic diagram and descriptors;Duarte;Process Safety Progress,2001
3. Technical Report on fire in substations prepared by the Laboratory of Technology Risks of Federal University of Pernambuco;Duarte,1999
4. Fitzgerald, R. The anatomy of the building firesafety. Unpublished book from the Woscester Polytechnic Institute-USA.
5. Performance criteria used in fire safety design;Hadjisophocleous;Automation in Construction,1999