1. Closed-loop CAPP/CAM/CNC process chain based on STEP and STEP-NC inspection tasks;Brecher;International Journal of Computer Integrated Manufacturing,2006
2. Dankwort WC, Podehl G. Industrial CAD/CAM application and system architecture — A closed loop. In: Proc. of international symposium on the tools and methods for concurrent engineering, p. 206–11. 1996
3. General Motors increases its production throughput;Alend;Interfaces,2006
4. An analytical formula for throughput of a production line with identical stations and random failure;Bluenfeld;Mathematical Problems in Engineering,2005
5. Entry T, Beyhen B. A simulation analysis for performance improvement studies in a cellular manufacturing system with dual resource constrained. In: Proc. of 35th international conference on computers and industrial engineering. 2005